Difference between revisions of "128-spring-2009"
From CCRMA Wiki
m (→Assignments) |
m (→Assignments) |
||
Line 8: | Line 8: | ||
All homeworks will be checked in to svn on Tuesday evenings. Details TBD. | All homeworks will be checked in to svn on Tuesday evenings. Details TBD. | ||
− | * Assignment #1<br/>(Tue, 4/7) "Unplugged" Instrument | + | * '''Assignment #1'''<br/>(Tue, 4/7) "Unplugged" Instrument |
− | * Assignment #2<br/>(Tue, 4/14) Single-hemi Instrument | + | * '''Assignment #2'''<br/>(Tue, 4/14) Single-hemi Instrument |
− | * Assignment #3<br/>(Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS) | + | * '''Assignment #3'''<br/>(Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS) |
− | * Assignment #4<br/>(Tue, 4/21) Multiple-Instrument Sound Sketch (MISS) | + | * '''Assignment #4'''<br/>(Tue, 4/21) Multiple-Instrument Sound Sketch (MISS) |
− | * Final Projects<br/> Piece to be premiered on the 6/3 Slork concert at Dink. | + | * '''Final Projects'''<br/> Piece to be premiered on the 6/3 Slork concert at Dink. |
== Slork Setup Sign-ins == | == Slork Setup Sign-ins == |
Revision as of 15:20, 1 April 2009
Contents
Concert Schedule
- (5/9) Slorktastic Chamber Music #1
- (5/16) Slorktastic Chamber Music #2
- (6/4) Dinkelspiel Slorkfest-of-Doom
Assignments
All homeworks will be checked in to svn on Tuesday evenings. Details TBD.
- Assignment #1
(Tue, 4/7) "Unplugged" Instrument - Assignment #2
(Tue, 4/14) Single-hemi Instrument - Assignment #3
(Tue, 4/21) Short-Single-Source-Slork-Sound-Sketch (SSSSSS) - Assignment #4
(Tue, 4/21) Multiple-Instrument Sound Sketch (MISS) - Final Projects
Piece to be premiered on the 6/3 Slork concert at Dink.
Slork Setup Sign-ins
Everyone signs up for at least one setup slot. Setup starts at 6:30 PM
Week 2 (4/8)
Week 3 (4/15)
Week 4 (4/22)
Week 5 (4/29)
Week 6 (5/6)
Week 7 (5/13)
Week 8 (5/20)
Week 9 (5/27)
Week 10 (6/3)
- everyone (@ DINK)