− | Can be done immediately:
| |
− | Cut tablecloths to dimensions of stage and entryway tables.
| |
− | 2 QSC speakers, stands and 1/4" cables moved into garage, CCARH, entryway
| |
| | | |
− | 1:30 Lucas and Stephen arrive
| |
− | 1 Flast screen TV and mount moved into the lounge from the garage
| |
− | Determine length of power cables needed and get those and a power strip from room 101. Move shelving unit out of grad area and down into CCARH if there are extra hands around to lift
| |
− | Clean up entryway, move some items into studio C, move the piano into outside entryway and arrange bouncy balls and a metal ball
| |
− | Set doors to be open for performance doors and regular operation doors
| |
− | Place signs throughout the building
| |
− | Cut and tape gels onto florescent lights. Place colored lights in CCARH and entryway.
| |
− |
| |
− | 3:30 Lucas leaves
| |
− |
| |
− |
| |
− | 4:00 Linnea leaves to get ice, eanabs and programs
| |
− |
| |
− |
| |
− |
| |
− | 5:00 Sandy arrives to help
| |
− | Arrange reception items at various places around the building
| |
− | Continue to assist artists with any of their technical needs
| |
− |
| |
− |
| |
− |
| |
− | 7:00 Lucas returns
| |
− | Artists should be set up
| |
− | Use gaffing tape to secure any cables that are on the ground
| |