Difference between revisions of "128-spring-2010"
From CCRMA Wiki
(→Slork Setup Sign-ins [everyone tears down]) |
(→Slork Setup Sign-ins [everyone tears down]) |
||
Line 61: | Line 61: | ||
* | * | ||
* | * | ||
+ | |||
+ | == GEAR == | ||
+ | |||
+ | [[Image:SpeakerSetup.jpg]] | ||
+ | |||
+ | The (hypothetical) numbering system for the current SLOrk speaker arrays! |
Revision as of 20:30, 5 April 2010
Contents
Concert Schedule
- (4/29) Slorktastic Chamber Music
- End of Quarter Final Spring Concert
Assignments
All homeworks will be checked in to svn on Tuesday evenings. Details TBD.
- Assignment #1
write a piece using ChucK and 6-channel hemi speaker(s) - Assignment #2
chamber piece for Slorktastic Concert - Assignment #3
ensemble piece for final Spring Concert
Slork Setup Sign-ins [everyone tears down]
Everyone signs up for at least two setup slots. Setup starts at 6:30 PM
Week 2 (4/7)
- Jieun
Week 3 (4/14)
Week 4 (4/21)
Week 5 (4/28)
Week 6 (5/5)
Week 7 (5/12)
Week 8 (5/19)
Week 9 (5/26)
Week 10 (6/2)
GEAR
The (hypothetical) numbering system for the current SLOrk speaker arrays!