256b-winter-2011/final: Difference between revisions
Appearance
Created page with '= Final Project: Social Musical Experience = Due date (checkpoint): 2010.2.7 3:15pm (class), Monday Due date (final): 2010.2.14 11:59:59pm, Monday === The goals of this assignm…' |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Final Project: Social Musical Experience = | = Final Project: A Social Musical Experience = | ||
=== Goals === | |||
=== | |||
* cloud-mediated, social musical instrument / experience | * cloud-mediated, social musical instrument / experience | ||
* must have a local (client-side) interactive component (audio + interaction mandatory, graphics optional) | * must have a local (client-side) interactive component (audio + interaction mandatory, graphics optional) |
Latest revision as of 06:06, 22 February 2011
Final Project: A Social Musical Experience
Goals
- cloud-mediated, social musical instrument / experience
- must have a local (client-side) interactive component (audio + interaction mandatory, graphics optional)
- primary interaction must be enhanced by the social component (e.g., location, compass, sharing of content, multiple participants, wide-area, collaboration, discovery, scale - zooming out, "micro- and macro-cosmic")
Deliverables
- milestone 0 (Wednesday, 2/16, in class): 30-second seed concept
- milestone 1 (Wednesday 2/23, in class): presenting the vision, design, and milestones (3-5 minutes) - presentation + feedback
- milestone 2 (Monday 2/28, in class): closing the loop (client | application server | data) - demo + feedback
- milestone 3 (Monday 3/7, in class): primary interaction / functionality done (minimal essential system) - demo + feedback
- final presentation (Thursday, 3/17, noon, CCRMA Stage): presentation! open to public
Note
- have fun with it!!!
- you are welcome to work together, but you must do/turn in your own work