|
|
| (4 intermediate revisions by 2 users not shown) |
| Line 1: |
Line 1: |
| Can be done immediately:
| |
| Cut tablecloths to dimensions of stage and entryway tables.
| |
| 2 QSC speakers, stands and 1/4" cables moved into garage, CCARH, entryway
| |
|
| |
|
| 1:30 Lucas and Stephen arrive
| |
| 1 Flast screen TV and mount moved into the lounge from the garage
| |
| Determine length of power cables needed and get those and a power strip from room 101. Move shelving unit out of grad area and down into CCARH if there are extra hands around to lift
| |
| Clean up entryway, move some items into studio C, move the piano into outside entryway and arrange bouncy balls and a metal ball
| |
| Set doors to be open for performance doors and regular operation doors
| |
| Place signs throughout the building
| |
| Cut and tape gels onto florescent lights. Place colored lights in CCARH and entryway.
| |
|
| |
| 3:30 Lucas leaves
| |
|
| |
|
| |
| 4:00 Linnea leaves to get ice, eanabs and programs
| |
|
| |
|
| |
|
| |
| 5:00 Sandy arrives to help
| |
| Arrange reception items at various places around the building
| |
| Continue to assist artists with any of their technical needs
| |
|
| |
|
| |
|
| |
| 7:00 Lucas returns
| |
| Artists should be set up
| |
| Use gaffing tape to secure any cables that are on the ground
| |