ArtsIntensiveSyllabus2010: Difference between revisions
No edit summary |
No edit summary |
||
Line 8: | Line 8: | ||
Lecture: Physics of sound, electricity and magnetism | Lecture: Physics of sound, electricity and magnetism | ||
Lab: Microphone and Hydrophone Building (Meet in the Classroom) | Lab: Microphone and Hydrophone Building (Meet in the Classroom) | ||
Line 14: | Line 15: | ||
Lab: Microphone Building | Lab: Microphone Building | ||
Lecture: Sound Design, Software for manipulation | Lecture: Sound Design, Software for manipulation | ||
Line 25: | Line 27: | ||
Lecture: Recording, Mic Placement, Analyzing and Modifying Sound | Lecture: Recording, Mic Placement, Analyzing and Modifying Sound | ||
Lab: Begin large sampling project, Talk about format for posting. | Lab: Begin large sampling project, Talk about format for posting. | ||
Line 39: | Line 42: | ||
9/7 Tuesday | 9/7 Tuesday | ||
AM Lecture: Instrument Design and Acoustics, Experimental Musical Instruments | AM Lecture: Instrument Design and Acoustics, Experimental Musical Instruments | ||
Lab: Make your own experimental musical instrument | Lab: Make your own experimental musical instrument | ||
9/8 Wednesday | 9/8 Wednesday | ||
Field trip to the Exploratorium and San Francisco’s Mission District | Field trip to the Exploratorium and San Francisco’s Mission District | ||
(Meet in front of Wilbur at 9am) | (Meet in front of Wilbur at 9am) | ||
9/9 Thursday | 9/9 Thursday | ||
Lecture: Demonstration of Spatialization and the CCRMA Listening Room | Lecture: Demonstration of Spatialization and the CCRMA Listening Room | ||
Lab: Recording and Sound Design | Lab: Recording and Sound Design | ||
9/10 Friday | 9/10 Friday | ||
Move Out Day | Move Out Day | ||
9/11 Saturday | 9/11 Saturday | ||
Field Trip to San Jose Junkyard (pick n’ pull) and Flea Market | Field Trip to San Jose Junkyard (pick n’ pull) and Flea Market | ||
9/13 Monday | 9/13 Monday | ||
Work on Final Projects | Work on Final Projects | ||
9/14 Tuesday | 9/14 Tuesday | ||
Work on Final Projects. Due at 5pm | Work on Final Projects. Due at 5pm | ||
Tech Rehearsal in CCRMA Stage | Tech Rehearsal in CCRMA Stage | ||
9/15 Wednesday | 9/15 Wednesday | ||
Help get speakers set up for final project and Transitions Concert. Learn to tune speakers. | Help get speakers set up for final project and Transitions Concert. Learn to tune speakers. | ||
8:30 Final Performance – please invite your friends | 8:30 Final Performance – please invite your friends | ||
9/16 Thursday | 9/16 Thursday | ||
Optional CCRMA Transitions Concert | Optional CCRMA Transitions Concert |
Revision as of 18:48, 1 September 2010
2010 Sound Art Intensive
Final Project: The goal of this class is to learn more about sound and to play with combining that sound in artful ways. The final project for the class will be a 2 – 3 minute composition that uses sound material that you and your classmates have recorded over the course of the next two weeks.Your final project is due by Tuesday, 9/14, at 5pm. Final pieces will be performed in the CCRMA courtyard on Wednesday, 9/15, at 8:30pm.
8/31 Tuesday
Lecture: Physics of sound, electricity and magnetism
Lab: Microphone and Hydrophone Building (Meet in the Classroom)
9/1 Wednesday
Lab: Microphone Building
Lecture: Sound Design, Software for manipulation
9/2 Thursday
Fieldtrip to Monterey Bay for Whale Watching (Meet in front of Wilbur at 9am)
9/3 Friday
Lecture: Recording, Mic Placement, Analyzing and Modifying Sound
Lab: Begin large sampling project, Talk about format for posting.
9/4 Saturday
AI Fieldtrip to San Francisco
9/6 Monday
Day Off
9/7 Tuesday
AM Lecture: Instrument Design and Acoustics, Experimental Musical Instruments
Lab: Make your own experimental musical instrument
9/8 Wednesday
Field trip to the Exploratorium and San Francisco’s Mission District (Meet in front of Wilbur at 9am)
9/9 Thursday
Lecture: Demonstration of Spatialization and the CCRMA Listening Room
Lab: Recording and Sound Design
9/10 Friday
Move Out Day
9/11 Saturday
Field Trip to San Jose Junkyard (pick n’ pull) and Flea Market
9/13 Monday
Work on Final Projects
9/14 Tuesday
Work on Final Projects. Due at 5pm
Tech Rehearsal in CCRMA Stage
9/15 Wednesday
Help get speakers set up for final project and Transitions Concert. Learn to tune speakers.
8:30 Final Performance – please invite your friends
9/16 Thursday
Optional CCRMA Transitions Concert