Jump to content

128-spring-2013: Difference between revisions

From CCRMA Wiki
Jieun5 (talk | contribs)
No edit summary
Jieun5 (talk | contribs)
Line 4: Line 4:
All homeworks will be checked in to svn prior to class. Details TBD.
All homeworks will be checked in to svn prior to class. Details TBD.


* '''Assignment1'''<br/> write a piece using ChucK and 6-channel hemi speaker(s)
* '''[[Assignment1]]'''<br/> analysis of *LOrk pieces
* '''Assignment2'''<br/> chamber piece for Slorktastic Concert
* '''[[Assignment2]]'''<br/> single-hemi instrument
* '''[[Assignment3]]'''<br/> ensemble piece for final Spring Concert
* '''[[Assignment3]]'''<br/> initial prototype for SLOrktastic
* '''[[Assignment4]]'''<br/> polish piece. program notes
* '''[[Assignment5]]'''<br/> write up: reflections of SLOrktastic
* '''[[Assignment6]]'''<br/> initial prototype for Spring Concert
* '''[[Assignment7]]'''<br/> revise prototype
* '''[[Assignment8]]'''<br/> polish piece
* '''[[Assignment9]]'''<br/> finalize piece. program notes
* '''[[Assignment10]]'''<br/> write up: reflections of Spring Concert


<br/>
<br/>

Revision as of 21:07, 30 March 2013

Assignments

All homeworks will be checked in to svn prior to class. Details TBD.


Slork Setup Sign-ins [everyone tears down]

Everyone signs up for at least 3 setup slots. Setup starts at 6:30 PM

Week 2 (4/10)

Week 3 (4/17)

Week 4 (4/24)

Week 5 (5/1)

Week 6 (5/8)

Week 7 (5/15)

Week 8 (5/22)

Week 9 (5/29)


GEAR

The (hypothetical) numbering system for the current SLOrk speaker arrays!