Jump to content

Evolving live performance setup: Difference between revisions

From CCRMA Wiki
Kimia (talk | contribs)
Created page with " == Evolving Live Performance Setup == Project proposal: == Week 1 == Initial brainstorming: == Week 2 == == Week 3 == == Week 4 == == Week 5 == == Week 6 ==..."
 
Kimia (talk | contribs)
Line 2: Line 2:
== Evolving Live Performance Setup ==
== Evolving Live Performance Setup ==


Project proposal:  
Goals:
 


1. Develop and expand my hybrid instrument for live performance.


2. Create small, portable, and minimal electronic/hybrid instruments.


== Week 1 ==
== Week 1 ==

Revision as of 23:35, 5 April 2022

Evolving Live Performance Setup

Goals:

1. Develop and expand my hybrid instrument for live performance.

2. Create small, portable, and minimal electronic/hybrid instruments.

Week 1

Initial brainstorming:


Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

Week 9

Week 10