Difference between revisions of "128-spring-2013"
From CCRMA Wiki
(→Equipment check-out log) |
(→Slork Setup Sign-up [everyone tears down]) |
||
Line 46: | Line 46: | ||
== Slork Setup Sign-up [everyone tears down] == | == Slork Setup Sign-up [everyone tears down] == | ||
− | Everyone signs up for | + | Everyone signs up for 3 setup slots. Setup starts at 6:40 PM |
===== Week 1 (4/3) ===== | ===== Week 1 (4/3) ===== | ||
Line 54: | Line 54: | ||
===== Week 2 (4/10) ===== | ===== Week 2 (4/10) ===== | ||
− | * Justin | + | * (Justin) |
* Victoria Grace | * Victoria Grace | ||
* Jim | * Jim | ||
Line 70: | Line 70: | ||
* Nick | * Nick | ||
* Justin | * Justin | ||
+ | * | ||
* | * | ||
===== Week 5 (5/1)===== | ===== Week 5 (5/1)===== | ||
+ | * | ||
* | * | ||
* | * | ||
Line 79: | Line 81: | ||
===== Week 6 (5/8)===== | ===== Week 6 (5/8)===== | ||
+ | * | ||
* | * | ||
* | * | ||
Line 85: | Line 88: | ||
===== Week 7 (5/15)===== | ===== Week 7 (5/15)===== | ||
+ | * | ||
* | * | ||
* | * | ||
Line 91: | Line 95: | ||
===== Week 8 (5/22)===== | ===== Week 8 (5/22)===== | ||
+ | * | ||
* | * | ||
* | * | ||
Line 97: | Line 102: | ||
===== Week 9 (5/29)===== | ===== Week 9 (5/29)===== | ||
+ | * | ||
* | * | ||
* | * |
Revision as of 11:43, 11 April 2013
Contents
Assignments
All homeworks will be checked in to svn prior to class. Details TBD.
- Assignment1
analysis of *LOrk pieces - Assignment2
single-hemi instrument - Assignment3
initial prototype for SLOrktastic - Assignment4
polish piece. program notes - Assignment5
write up: reflections of SLOrktastic - Assignment6
initial prototype for Spring Concert - Assignment7
revise prototype - Assignment8
polish piece - Assignment9
finalize piece. program notes. pre-concert write-up
Office Hours
We suggest that you email us in advance if you plan on coming into office hours.
- Kurt: Mondays 5:05-7pm
- Spencer: Tuesdays 1-3pm
- Jieun: by appointment
Group Check-in Meetings Sign-up
Every group (and all members of the group) should attend a check-in meeting in preparation for our two concerts.
SLOrktastic Chamber Music
Sign up for a check-up meeting with the teaching staff on the week of 4/22 (wk 4).
(Sign-up slots will become available here around 4/17)
Spring Concert: group check-in meetings
Sign up for a check-up meeting with the teaching staff on the week of 5/13 (wk 7) or week of 5/20 (wk 8).
(Sign-up slots will become available here around 5/8)
Slork Setup Sign-up [everyone tears down]
Everyone signs up for 3 setup slots. Setup starts at 6:40 PM
Week 1 (4/3)
- Kurt
- Spencer
- Jieun
Week 2 (4/10)
- (Justin)
- Victoria Grace
- Jim
- Josh
Week 3 (4/17)
- Caleb
- Jianfeng
- Reza
- Luke
- Audrey
Week 4 (4/24)
- George
- Nick
- Justin
Week 5 (5/1)
Week 6 (5/8)
Week 7 (5/15)
Week 8 (5/22)
Week 9 (5/29)
GEAR
The (hypothetical) numbering system for the current SLOrk speaker arrays!
Equipment check-out log
- Caleb, Victoria, Luke, Justin: 1 gametrak controller each (checked out 4/10)